Falls Lake Dam Renovation
Trusted by the United States Army Corps of Engineers, this Dam renovation was executed without error.

The Outcome
Wake Forest, North Carolina
Scope: Creating new concrete Weir Walls with custom aluminum weep drains made to allow 2" of flow at mean high water. Repaired 200 feet of perforated concrete toe drains.
The U.S. Army Corps of Engineers needed a qualified team to engineer and construct in an important waterway structure with environmental concerns. They knew they could trust The Wexing Group to renovate the Falls Lake Dam right the first time.